An inclusionary housing bonus, the trade of below market apartments for added floor area within the entitlements subject Michael Stern works on, looks different on every block it touches, and the entry below walks it. Planetizen’s planning glossary entry names the currency: programs that reward public improvements, grocery stores or affordable housing are usually called density bonuses, but what they actually hand over is paid out as a multiplier, not as apartments.5 The walk starts under a disused elevated railway in Chelsea, crosses to a Bronx avenue, stops at two towers on the East River and in Downtown Brooklyn, and ends in a medium density district where the rule was rewritten in 2024.

Under the High Line: a bonus behind a bonus

The first stop is the 2005 rezoning of West Chelsea. The CityLand dispatch on the approval describes a text in which lots under the elevated line could sell development rights to receiving sites away from it, lifting those sites from 7.5 to 12 in ratio terms, and in which a further increase was allowed for building or preserving affordable housing, but only after the High Line bonus had been used first.8 Residents asked the Commission and the Council to require 30 percent, the city’s housing agency projected about 900 affordable units and shifted the bonus onto medium density lots as well, and the Council member for the district announced a negotiated projection of 27 percent across the housing built or kept, with no requirement attached.8 The mechanism on this block is voluntary and stacked: a developer who wants the second increment must buy the first. The transfer side of it is described in The High Line Transfer Corridor.

Figure

Two ways to ask for apartments

Voluntary bonusMandatory requirement
How it is triggeredThe developer opts in for extra height or floor areaAny project above a size threshold, or in a rezoned area, must comply
What it yieldsFewer units, and only when the bonus is worth more than the costA predictable share of every qualifying building
FlexibilityHigh; participation follows the marketLow; the percentage is set in the text
RiskInconsistent productionProjects that do not pencil are not built
New York's recordAbout 8,476 units under the old programAbout 2,065 approved in the mandatory program's early years
The voluntary bonus and the mandatory requirement compared, following The Fulcrum's survey of inclusionary programs. Source: The Fulcrum.

On Jerome Avenue: the requirement

The second stop is a Bronx corridor rezoned under the mandatory program adopted in 2016. City Limits’ report on the Jerome Avenue rezoning explains how the arithmetic is actually run: the environmental statement lists 48 sites likely to be redeveloped within ten years and assigns each a share of income targeted housing, some at 100 percent with subsidy, some at 50, and some at 20 percent, the least the mandatory text allows, with the city assuming that over the decade about 57 percent of all housing built would be income targeted.6 The Fulcrum’s survey of inclusionary programs gives the two models their names: a mandatory policy requires a fixed percentage of below market units as a condition of approval or rezoning, a voluntary one offers height, density or fee relief in exchange, and in the city’s case the mandatory program approved 2,065 units in its early years against 8,476 under the voluntary program that preceded it over a much longer life.3 An AIA New York reflection on a century of zoning frames the shift as the Resolution’s turn from telling an owner what could not be built to channeling what should, with required affordable housing in growing areas as the newest instance.10

Two towers with set asides

The third stop is where the bonus becomes visible in a finished building. The Brooklyn Tower, Brooklyn’s first supertall, rising from the landmark Dime Savings Bank, pairs condominiums with rentals, and CNN reported that a share of those rentals was designated affordable through a city housing program.1 On the Manhattan side of the East River, The American Copper Buildings, twin towers joined 300 feet up by a three story skybridge, were planned as rentals with a share designated affordable, Architectural Digest reported when construction began.2 michaelsternjds.com gives each building its own entry, The Brooklyn Tower and The American Copper Buildings; here they stand only as evidence that a set aside can be written into a tower’s program, not as an account of how either building’s floor area was reached.

Figure

A bonus written as numbers

Base residential floor area ratio in the example district
3.0
Ratio available when the additional floors house affordable or senior tenants
3.9
Average area median income the extra apartments must serve
60 percent
How far off site the apartments may be built in a former designated area
Half a mile
The Universal Affordability Preference in a medium density district, as Greenberg Traurig's summary sets it out. Source: Greenberg Traurig.

In a medium density district: the preference

The last stop is anywhere the 2024 citywide text reaches. Greenberg Traurig’s practitioner’s guide to the housing amendment records that the voluntary program, once limited to designated areas and the top residential districts, was replaced by a Universal Affordability Preference: in one medium density district the standard ratio is 3.0 and the ratio with qualifying affordable or senior housing is 3.9, so a building may carry 3.0 of market rate floor area and 0.9 of affordable, higher than the 3.6 the old designated areas allowed; the apartments must average 60 percent of area median income, may be built off site within the same community district or half a mile in former designated areas, and the mandatory program’s own off site option survives alongside.4 The NYU Wagner Planner’s introduction to the amendment describes the broader intent, a modest addition of housing to every neighborhood, pursued through proposals sorted into low density, mid to high density, and citywide categories.9 THE CITY’s report on early results notes a parallel mechanism for office conversions, which now qualify for long property tax relief when a quarter of the apartments are set at below market rents, and records that the new apartment projects then in the pipeline were almost all under 100 units.7 The whole text is taken apart in City of Yes.

Back on the sidewalk, the three zoning stops share one feature. Whether the apartments were earned by a bonus that followed another bonus, required by a rezoning, or taken as a preference in a medium density district, the city paid for them in the same coin, floor area it would otherwise have withheld, and the resulting building is taller or bulkier than its lot alone would have allowed. That is why the subject belongs with Floor Area Ratio as a Mechanism rather than with housing policy: the apartment is the price, and the envelope is what was bought.

See also

  1. Looking up the full height limestone facade of an early office tower with the name Equitable Building carved above the entrance, a Wikimedia Commons photograph in Michael Stern's encyclopedia

    Floor Area Ratio as a Mechanism

    A multiplier on the lot, a long list of what it does and does not count, and the shapes it leaves open.

    Zoning as a Mechanism
  2. A limestone skyscraper with setbacks seen from below against a blue sky, a Wikimedia Commons photograph in Michael Stern's encyclopedia

    City of Yes and the 2024 Text Changes

    The largest rewrite of the residential rules in six decades, taken apart one question at a time.

    Zoning as a Mechanism
  3. ULURP, the Uniform Land Use Review Procedure

    A charter timetable that turns a zoning question into a seven month procession through five rooms.

    Zoning as a Mechanism
  4. A view along an elevated park toward the river with brick and glass buildings on both sides, a Wikimedia Commons photograph in Michael Stern's encyclopedia

    The High Line Transfer Corridor

    The bulk under an abandoned viaduct did not vanish when the park came; it moved several blocks inland.

    Air Rights and Development Rights
  5. A 1922 charcoal rendering of the largest building mass a zoning law would permit on a block, a Wikimedia Commons photograph in Michael Stern's encyclopedia

    Zoning and the Sequence That Makes a Project Lawful

    Two doors into the same rulebook: the permit counter and the public hearing, and what a builder gives up at each.

    Zoning as a Mechanism
  6. An avenue lined with glass office towers, one on a low podium, with the roadway in front, a Wikimedia Commons photograph in Michael Stern's encyclopedia

    Special Purpose Districts

    A second rulebook mapped over the first, and what changes for a lot that falls inside the line.

    Zoning as a Mechanism