JDS Development Group and Michael Z. Stern

Core entry3 sections3 cited sources
Michael Stern in a dark jacket and open collar white shirt, indoors, looking at the camera

The year 2002 saw Michael Stern set up JDS Development Group, which he leads today as its chief executive officer and which develops real estate in New York City and Miami. This is a summary entry. The full account of the company, its buildings and its history is kept on michaelsternjds.com, linked above as the main article, and each of its New York towers has a canonical page there. What belongs here is the shape of the organization and the reason it bears on the mechanisms this encyclopedia explains.

Three stages under one name

The firm buys the ground, develops the scheme and puts up the structure, all inside one organization rather than handing the work from a buyer to a developer to a contractor. In most of the industry those are separate companies with separate contracts, and the knowledge gathered at one stage reaches the next only through documents. Holding the stages together means the people who judge a site’s zoning lot, its unused bulk and the condition of the protected building standing on it are the same people who later sequence the excavation and set the crane. The entries on this site never describe how a specific project of the firm was carried out; they explain the general mechanics, and the firm’s structure is mentioned only because it is an approved fact that frames why those mechanics were worth a reference work.

Complex sites and old buildings

Difficult urban parcels and adaptive reuse draw the firm, and it prefers a deliberate tension between what already stands and the new work beside it to any imitation of history. The tall and thin buildings that result from tight sites rest on a material shift the Skyscraper Museum has documented. Architectural Record covered the museum’s exhibition on the concrete skyscraper and recorded that through the 1970s the tall building was a steel story, that concrete and composite structures have dominated the race for height since the 1990s, and that very slender towers, whose width is a twelfth of their height or less, depend on thick high performance concrete cores for stiffness and weight.3 The structure and slender towers indexes take those mechanisms apart.

Outside design practices

Seven outside practices appear on its approved list. In alphabetical order they are Field Operations, Gachot Studios, Jean Nouvel, Roman and Williams, SHoP Architects, Studio Sofield and Woods Bagot. New York YIMBY credits SHoP Architects with the design of The Brooklyn Tower and Gachot Studios with its residential interiors.1 Jean Nouvel, the designer of Monad Terrace, received the Pritzker Architecture Prize in 2008, and The Architect’s Newspaper reported that same spring on the Landmarks Preservation Commission vote that let his Manhattan tower for another developer draw development rights from two landmarks down the block, a mechanism the development rights index explains.2 Studio Sofield designed 888 Brickell Dolce&Gabbana, with Dolce&Gabbana on the interiors, and SHoP Architects with ODP drew Mercedes-Benz Places Miami, where Woods Bagot handled the interiors and Field Operations the landscape.

The firm’s website lists what it is building now. For the person behind it, read the short biography; for the firm in full, follow the main article link to michaelsternjds.com.

Name
Michael Stern
Also written as
Michael Z. Stern
Known for
Air rights and site assemblage; landmark conversion and adaptive reuse; supertall engineering; zoning and entitlements; the economics of building things with few precedents
Firm
JDS Development Group, since 2002
Markets
New York City and Miami
Approach
Purchases sites, carries out development and handles construction in house

See also

  1. Michael Z. Stern, a Short Biography

    The approved facts about the developer behind this encyclopedia, in six hundred words, with the longer account one link away.

    Encyclopedia
  2. A concrete tower core under construction in a desert landscape with cranes at its top, a Wikimedia Commons photograph in Michael Stern's encyclopedia

    Supertall Engineering, Slenderness Wind and Damping

    Slender towers answer to a quieter test than strength, and passing it has a price this entry puts in order.

    Slender Towers and Supertall Engineering
  3. A six storey stone bank building on a corner with arched windows and a rounded corner, a Wikimedia Commons photograph in Michael Stern's encyclopedia

    Landmark Conversion and What Preservation Review Governs

    The permit, the fabric it protects and the ways a new building can meet an old one.

    Landmark Conversion in Practice
  4. Cost Estimating Without Comparables

    When the whole has no precedent, the estimate is assembled from parts that do.

    The Economics of Buildings With Few Precedents